M9sol Logbooks
Solenoid
Daily log
Solenoid logbook
Fields marked with
*
are required
Entry time:
Wed Jan 15 13:51:37 2025
Author
*
:
- please select -
Doug Preddy
Curtis Ballard
Kevin Trithardt
David Kishi
Experimentor
Other
Operational Mode:
- please select -
Normal Running
Quench Recovery
Start Up
Shut Down
Maintenance
Other
Subject
*
:
> Even though cr_c1 and cr_c12 have begun to tick down, cr_c7 and cr_c6 are > actually ticking up. This is probably a wave of warming propagating through > the solenoid. As long as the two inlets are falling in temperature then > things are going in the right direction. Once the warm wave travels through > the outlets will begin to cool as well.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455