M9sol Logbooks
Solenoid
Daily log
Solenoid logbook
Fields marked with
*
are required
Entry time:
Wed Jan 15 12:57:43 2025
Author
*
:
- please select -
Doug Preddy
Curtis Ballard
Kevin Trithardt
David Kishi
Experimentor
Other
Operational Mode:
- please select -
Normal Running
Quench Recovery
Start Up
Shut Down
Maintenance
Other
Subject
*
:
> Tuesday night. June 27, 2006, the solenoid quenched for no apparent > reason. It was restarted Wednesday morning. The vacuum in the solenoid > went away (up to 8 Torr). This was found to be a result of a leaking > isolation valve between the solenoid and T2. T2 was vented, which caused > the solenoid to slowly vet. When T2 was pumped out again, the solenoid > vacuum recovered. This caused a delay in recovering the solenoid. As of > Friday morning 7:15 the solenoid power supply was ramped up.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455