M9sol Logbooks
Solenoid
Daily log
Solenoid logbook
Fields marked with
*
are required
Entry time:
Wed Jan 15 13:54:56 2025
Author
*
:
- please select -
Doug Preddy
Curtis Ballard
Kevin Trithardt
David Kishi
Experimentor
Other
Operational Mode:
- please select -
Normal Running
Quench Recovery
Start Up
Shut Down
Maintenance
Other
Subject
*
:
> The solenoid was found to be warm on Monday morning. M9Q3 had a bad water > leak over the weekend. The water header serving Q3 was turned off and the > leak confirmed. Q3 was isolated and the header was turned back on. My > supposition is that while the main header was turned off, the diff. pump > under the solenoid tripped. When I looked at it this morning the > compressor was off and the vesssel vacuum was very bad. The PLC connection > to EPICs is down, so I can not restart the vacuum system yet. Mike Leross > is looking at the problem. > There was no trip signal to the main control room. It looks as though the > control room signal was bypassed downstairs. > The power supply fault light was on on the QRL panel, but I okayed Bob > Hilton locking out the power supply in order that Q3's water leak can be > repired. Shutting of the main breaker may have turned on this light. The > other possibility is that the power supply was not ramped down and shut > off properly.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
ELOG V2.9.2-2455